Regulator to be notified of proposed manufacture of concrete panel (3)

A notice under subregulation (1) or (2) must be made in the approved form and in the manner approved by the regulator and must specify —
(a) the construction site or other workplace at which the proposed manufacturing work is to take place; and
(b) the construction site at which the panel is to be incorporated as a wall (including a retaining wall) once the process by which the panel is manufactured is complete.